The purpose of this outage is to perform a shut down test of the Air Handler Unit that provides supply air to the 4th floor. During the outage, the supply and exhaust air flow rates on floors 4 and 5 will be reduced.
The purpose of this outage is to perform a shut down test of the Air Handler Unit that provides supply air to the 4th floor. During the outage, the supply and exhaust air flow rates on floors 4 and 5 will be reduced.