Due to preventive maintenance on electrical gear, we will turn power off to the part of the above listed building. This will affect the normal power and lighting on the 5th, 6th, 7th, 8th, 9th, 10th, and Penthouse floors. The Autoclaves on the 3rd and 4th floors will also be down for the duration of the outage. The Generator will run for the duration of the outage, providing power to lights and equipment connected to Emergency power. There will be NO work allowed in the BSL3 areas during above listed times.