The purpose of the outage on 4/30/15 is too replace the pulleys and belts for the motor and fan on the Air Handler Unit serving the 4th floor. During this outage the Air Handler Unit will not operate and the 4th and 5th floors will have reduced air flows. This outage will be completed by 8:00 a.m.
The purpose of the outage on 5/01/15 is to replace the pulleys and belts for the motor and fan on the Air Handler Unit serving the 3rd floor. During this outage the Air Handler Unit will not operate and the 3rd floor will be without any heating or cooling and the Cage Wash area will not have any supply air. This outage will be completed by 8:00 a.m.