The purpose of this outage is to replace the belts and pulleys for Air Handler Unit #3. During this outage floors 2, 3 and 4 will have reduced air flows.
The purpose of this outage is to replace the belts and pulleys for Air Handler Unit #3. During this outage floors 2, 3 and 4 will have reduced air flows.