Sent on behalf of BJH:
From 7pm today until 5am tomorrow, workers will erect scaffolding over the Metro Garage doors and ramp for the link construction. Egress will be maintained at all times to the elevator lobby and drive ramp.
Sent on behalf of BJH:
From 7pm today until 5am tomorrow, workers will erect scaffolding over the Metro Garage doors and ramp for the link construction. Egress will be maintained at all times to the elevator lobby and drive ramp.