The purpose of this outage is to replace the temperature control system of the Air Handler Unit. During this outage the 5th floor will be without all heating and cooling.
The purpose of this outage is to replace the temperature control system of the Air Handler Unit. During this outage the 5th floor will be without all heating and cooling.