Event Details


Air Handler 1A and 1B will be down from 6am-4pm. There will be limited air flow to the 1st, 2nd, 3rd and 4th floors during this time.

Air handler 9A and 9B will be down from 6am-12pm. There will be limited air flow to the 9th floor during this time.

This is to assist with the efficiency controls project for the building. This will not affect equipment rooms on these floors.