Event Details


The purpose of this outage is to perform an upload of the temperature control program of the Air Handler Unit building automation controller that supports the BSL3 systems in the building. During the upload process there should be no interruption to the Air Handler Unit that would cause it to shut down. Facilities Engineering staff will be on-site to assist recovering the Air Handler Unit if it would shut down.