Due to construction in the building, all power to the 3rd floor will be shut down during above listed times. This is the same outage that occurred on 7/2/2018.
We thank you for your patience and understanding at this time.
Due to construction in the building, all power to the 3rd floor will be shut down during above listed times. This is the same outage that occurred on 7/2/2018.
We thank you for your patience and understanding at this time.