Event Details


ASCO (contractor) must test the automatic transfer switch system at the fire command center in the BJCIOH building. All twelve automatic transfer switches (ATS) will need to be tested at this time. The building emergency generator will be running prior to switching so there will be a slight blip but not a complete loss of emergency power to the customer. The normal building power will not be affected during the testing.