Event Details


To make repairs to the duct work and its associated systems there will be possible nightly outages on the 10th floor north side between these dates. The outages will begin no earlier than 6 pm and end no later 5 am. The heating and cooling of the areas will be affected by the outage but we do not anticipate wide swings in temperature. Technicians will possibly be working above ceilings inside of labs during these times.