Event Details


The purpose of this outage is to replace the VAV box controller for the 562-B BSL3 lab. During this outage the Air Handler Unit that serves the 5th floor will be turned off as well as the Exhaust Fans that serve lab 562-B BSL3 lab. After the new controller has been installed Facilities will perform failure mode testing to confirm that the new controller is functioning correctly.

We thank you for your patience and understanding at this time.