Event Details


The purpose of this outage is to perform a performance test of the new temperature control system that was recently installed for an Air Handler Unit. During this test there will be interruptions of air flow to floors 10, 11 and 12 which will cause air flow alarms for the BSL3 facility on the 11th floor and may cause temperatures to fluctuate as well.