Event Details


The purpose of this outage is to repair an issue with the supply fan system for the Air Handler Unit that provides supply air to the 11th floor. During the outage the Air Handler Unit will be shut down to perform an inspection and determine the cause of the failure and perform the repair. As a result, there will be no heating or cooling available to the 11th floor. AT NO TIME DURING THIS OUTAGE SHOULD ANY WORK TAKE PLACE IN THE 11th FLOOR BSL3 FACILITY.

A follow-up notification will be delivered indicating when the repairs have been made and when it is okay to resume work in the BSL3 facility.

We thank you from your patience and understanding at this time.